Risk & Compliance Intelligence

Centralised operational risk · linked to live AI alerts, assets, estates and millsAll operations
Open risks
16
0 added from AI signals
Critical (score ≥ 15)
2
Board-level visibility
High (10–14)
6
Executive owner assigned
Rising trend
7
Exposure increasing
Avg risk score
9.8
Likelihood × impact (max 25)
Compliance due (30 d)
6
3 with evidence gaps / at risk
Category

Likelihood × Impact matrix

16 risks · click a cell to filter the register

Likelihood →
5 Almost certain
4 Likely
3 Possible
2 Unlikely
1 Rare
1 Minor
2 Moderate
3 Significant
4 Major
5 Severe
Impact →
low 1–4medium 5–9high 10–14critical 15–25

Risks by category

Count by rating · click a bar to filter

Risk heat trend

Aggregate exposure (Σ likelihood × impact) by category, last 6 months

AprMayJunJulAugSep
Operational262933384348
Asset81011131416
Safety282826252322
Environmental161819212224
Supply Chain161816171717
Financial121212121212
Compliance141614151618
Operational, Environmental and Asset exposure rising into peak crop seasonBack-cast from trend

Enterprise risk register

16 of 16 risks · click a row for detail

Synthetic register · ratings illustrative
RiskCategoryL×IOwner · locationMitigationEvidenceTrendLinks
RSK-01
Unplanned sterilizer outage at Mill A (ST-04)
Asset16
Mill A Manager
Mill A
Bearing transfer from Mill B + planned replacement in low-intake windowVibration trend, failure model 82%Rising
/assets/ST-04
RSK-05
Peat fire in Kalimantan dry season
Environmental15
Sustainability Head
Estates C & D
Canal water management, patrols, ERT readinessFire risk 81 (B24), hotspots nearbyRising
/esg/land
RSK-02
OER erosion from crop quality & evacuation delays
Operational12
Mill A Manager
Mill A / Estates A, B, E
Dispatch optimisation, ripeness grading at CPRCA — overripe 10.6%, H2M 26 hRising
/mill/root-cause
RSK-03
Estate C production shortfall vs budget
Operational12
Kalimantan Region Head
Estate C
Harvester reallocation; round-interval controlForecast −11% month-endRising
/harvest
RSK-04
Ganoderma spread in Estate B (B17/B12)
Operational12
Estate B Agronomist
Estate B
Census, sanitation, soil moundingDisease model 72% / 58%Rising
/agronomy/pest-disease
RSK-09
PPE non-compliance in mill hot zones
Safety12
HSE Manager
Mill A & B
CV monitoring + supervisor coaching3 events awaiting reviewStable
/workforce/safety
RSK-11
CPO price downside (−10% scenario)
Financial12
CFO
Group
Forward sales policy; cost programmeScenario model 90-day P10Stable
RSK-10
Vehicle–pedestrian interaction at loading ramps
Safety10
HSE Manager
Mill A ramp, CPs
Exclusion zones, spotters, proximity alerts2 proximity events this weekEasing
RSK-07
Critical spare-part single sourcing (bearings)
Supply Chain9
Procurement Lead
Group
Qualify second vendor; raise safety stock for class-A sparesVendor concentration 78%Stable
RSK-13
Methane emissions from open POME ponds (Mill B)
Environmental9
Sustainability Head
Mill B
Methane capture project feasibilityBiogas capture 0% at Mill BStable
RSK-06
Fertilizer supply disruption (Q4 round)
Supply Chain8
Procurement Lead
Warehouse 03
Expedited PO, inter-warehouse transferStockout prob 18% / 14 dStable
/supply-chain
RSK-16
Buffer-zone encroachment (riparian)
Compliance8
Sustainability Head
Estate D north boundary
Boundary patrol, community engagementLand-cover change 0.8 ha (synthetic satellite)Stable
RSK-08
Weighbridge control weakness
Compliance6
Internal Control
Mill A
Anomaly review workflow; tare re-certification6 tickets flagged / 7 daysStable
/logistics/weighbridge
RSK-14
Sensor data gaps reducing model confidence
Operational6
Head of Data
Mill B SCADA
Gateway replacement; data-quality SLAsCompleteness 91.2% on MB-SCADAEasing
RSK-15
Drainage failure / waterlogging (Estate D)
Operational6
Estate D Manager
Estate D sector D-14
Outlet clearing; water-gate SOPSoil moisture 0.46Rising
/agronomy/water
RSK-12
Procurement split-purchase pattern
Compliance4
Procurement Compliance
Mill A
Threshold review; automated PR aggregation7 POs below thresholdRising

AI emerging risks

Weak signals that may become register risks within 90 days

Early warning
OperationalConfidence82%
Mill A overripe share 6.1% → 10.6% in 7 days
→ Sustained OER loss & supplier grading disputes · source: FFB Grading (Vision) + OER model
71%likely in 90 d
Signal source
Supply ChainConfidence77%
Bearing vendor lead time drifting 21 → 28 days
→ Class-A spare stockout during peak crop · source: Procurement lead-time monitor
62%likely in 90 d
Signal source
EnvironmentalConfidence80%
Kalimantan rainfall deficit −34% and rising hotspot count
→ Escalated peat fire exposure & haze regulation · source: Weather + satellite hotspot feed
66%likely in 90 d
Signal source
SafetyConfidence72%
Mill A maintenance overtime 24.8 h/month (above policy)
→ Fatigue-related incident during ST-04 bearing job · source: Workforce analytics (aggregate)
48%likely in 90 d
Signal source
ComplianceConfidence74%
12% of third-party FFB volume lacks plot-level traceability
→ Deforestation-free market access restrictions · source: Supplier traceability register
54%likely in 90 d
Signal source

Compliance calendar

Permits, certification audits, statutory inspections · next 60 days

Synthetic obligations
October 2026
02
4 d
Statutory boiler inspection — Boiler B-1
Statutory inspection · Mill A · Mill A Engineer
Inspector booked; water-treatment logs complete
On track
06
8 d
RSPO-style surveillance audit — Mill A supply base
Certification audit · Mill A + Estates A, B, E · Sustainability Head
3 of 41 evidence items missing (smallholder traceability)
Evidence gap
09
11 d
POME discharge permit — quarterly report
Regulatory report · Mill B · Mill B Environment Officer
BOD/COD lab results received
On track
14
16 d
ISPO-style certification renewal — document submission
Certification audit · Estate C · Estate C Manager
HGU map revision pending surveyor sign-off
At risk
20
22 d
Weighbridge metrology calibration
Calibration · Mill A · Internal Control
Linked to weighbridge control risk RSK-08
On track
27
29 d
Pressure-vessel certificate — Sterilizer ST-04
Statutory inspection · Mill A · Mill A Maintenance
Schedule after BR-6208 bearing replacement (30 Sep window)
At risk
November 2026
03
36 d
Peat fire-readiness inspection
Statutory inspection · Estates C & D · Sustainability Head
ERT drill completed 21 Sep
On track
12
45 d
Pesticide storage licence renewal — WH-04
Permit / licence · Estate C · Procurement Lead
Awaiting agency acknowledgement
Submitted
20
53 d
Environmental monitoring report (semester)
Regulatory report · Group · Sustainability Head
Air, water & biodiversity monitoring consolidated
On track
V-TEKI — IT & Business ConsultingDeveloped by V-TEKI · IT & Business ConsultingPrime Agri AI Intelligence Platform — prototype. All operational records are synthetic; model outputs are simulated; financial impacts are scenario estimates; recommendations require human validation. No actual company confidential data is used.