Cross-Domain AI
Scenario: Sterilizer ST-04 degradation at Mill A — from sensor signal to management decision
How intelligence modules communicate
One signal, seven connected AI decisions — in under 5 minutes, automatically
AI recommended decision
Transfer bearing + schedule maintenance during low-production window
Confidence87%
Why this option
Repairing immediately would stop Line 2 at peak intake and create restan; waiting risks an 82% chance of an unplanned 9-hour outage plus secondary damage. Mill B holds 3× BR-6208 while Mill A holds none, and the supplier lead time (21 days) exceeds the failure window. Transferring one bearing (ETA Tue 29 Sep, 16:00 (air freight Pangkalan Bun → Pekanbaru + road)) and replacing it in the Wednesday low-intake window minimises risk-weighted cost.
Mill A store (WH-01)
0 × BR-6208
Mill B store (WH-02)
3 × BR-6208
Supplier lead time
21 d
Maintenance window
Wed 30 Sep 22:00–04:00
criticalPending ApprovalACT-001 · Supply ChainConfidence90%
Transfer bearing BR-6208 from Mill B to Mill A
Reserve 1× BR-6208 at WH-02 (3 on hand) and air-freight to WH-01. ETA Tue 29 Sep, 16:00 (air freight Pangkalan Bun → Pekanbaru + road).
criticalPending ApprovalACT-002 · MaintenanceConfidence87%
Replace ST-04 door-drive bearing in low-intake window
Inspect within 12 h; replace bearing Wed 30 Sep, 22:00–04:00 (low-intake window). Divert Line 2 intake to Lines 1 & 3 during work.
Business impact — calculated
Planned intervention vs run-to-failure
Scenario estimate · synthetic assumptions
Downtime avoided
8 h
Sterilizer Line 2
FFB processed on time
440 t
no restan build-up
CPO production protected
95 t
+ 23 t kernel
Revenue protected
Rp 1.50 bn
timing & quality
Financial exposure avoided
Rp 1.09 bn
risk-weighted
Expected cost by option (Rp m, risk-weighted)
Option B (green) is recommended. Residual failure risk: A 2% · B 7% · C 82%.
Configurable assumptions
Includes restan OER penalty, emergency repair premium (Rp 185 m) and secondary damage (Rp 420 m), net of planned repair cost (Rp 68 m).
All figures derived from synthetic data and scenario assumptions; recommendations require validation by accountable managers.